Large diameter bored piles - icac.org.hk
2009-4-9 · During concreting, the temporary casing is progressively removed. Sonic tests: After concreting, all large diameter bored piles must undergo sonic tests. An emitting probe and a receiving probe are placed inside two separate sonic tubes, and are hoisted up and down the bored pile.